Nantong–Suzhou–Jiaxing–Ningbo high-speed railway

Proposed high-speed railway in China
  • Jiangsu province
  • Zhejiang province
Termini
ServiceSystemChina Railway High-speed China Railway High-speedOperator(s)China Railway CR ShanghaiHistoryPlanned opening2027[1]TechnicalLine length332 km (206 mi)Track gauge1,435 mm (4 ft 8+12 in) standard gaugeElectrification25 kV 50 Hz AC (Overhead line)Operating speed350 km/h (217 mph)
Route map

Legend
Zhaodian
Nanjing–Qidong railway to Nantong East
Nantong West
Husutong Yangtze River Bridge
Zhangjiagang North
Zhangjiagang
Changshu West
Suzhou North
Suzhou East tunnel
Rudong–Changxing ICR from Rudong South
Souzhou East link
Sudian–Shanghai ICR
Rudong–Changxing ICR to Changxing
Suzhou South
Shanghai–Huzhou HSR
Jiaxing North
Jiaxing South
Shanghai–Jiaxing–Hangzhou HSR
Left arrowHangzhou South
Right arrowShanghai East
Haiyan West
Cixi
Wulei Mountain tunnel
Cicheng North signal station
Zhuangqiao
Ningbo
Ningbo East
Yunlong freight yard
Ningbo West
Ningbo–Wenzhou HSR to Wenzhou East
Fenghua
This diagram:
  • view
  • talk
  • edit

The Nantong–Suzhou–Jiaxing–Ningbo high-speed railway or Tongsujiayong high-speed railway (Chinese: 通苏嘉甬铁路; pinyin: Tōng-Sū-Jiā-Yǒng tiělù, "Tong", "Su", "Jia" and "Yong" being the abbreviations for Nantong, Suzhou, Jiaxing and Ningbo, respectively) is a high-speed railway line between Nantong and Ningbo in China. It is expected to open in 2027.[1]

The railway is expected to reduce the journey time from Ningbo to Suzhou and Shanghai to around one hour.[2]

History

In October 2020, geological surveys began in preparation for the construction of a bridge across Hangzhou Bay which will carry the railway.[3]

Construction on the railway started on 30 November 2022.[4]

Route

The line takes new north–south route which bypasses Shanghai, instead heading via Suzhou, Jiaxing, and Cixi. The total length of the line is 310 kilometres (190 mi), of which 301 kilometres (187 mi) will be newly built. The line crosses the Yangtze River via two tracks of the four-track Hutong Yangtze River Bridge. The other two tracks carry the Nantong–Shanghai railway.

It is however not the first railway to travel between Suzhou and Jiaxing. The Suzhou–Jiaxing railway operated from the 1930s to 1944.

Station Name Chinese Metro
transfers/connections
Location
Nantong West 南通西  1  Nantong Jiangsu
Zhangjiagang 张家港 Suzhou
Changshu West 常熟西
Suzhou North 苏州北 Suzhou Rail Transit  2 
Suzhou South 苏州南
Jiaxing North 嘉兴北 Jiaxing Zhejiang
Jiaxing South 嘉兴南
Haiyan West 海盐西
Cixi 慈溪  Ningci  Ningbo
Zhuangqiao 庄桥  4 
Ningbo 宁波  2   4 
Ningbo West 宁波西  2   6   9   12 
Fenghua 奉化  3 

References

  1. ^ a b "长三角上的"阿拉"再提速 千亿工程通苏嘉甬高铁呼啸而至". news.cnnb.com.cn. Archived from the original on 2022-11-30. Retrieved 2022-11-30.
  2. ^ "通苏嘉甬铁路项目总体技术方案确定". fgw.ningbo.gov.cn. Retrieved 2020-11-23.
  3. ^ "通苏嘉甬铁路新进展!铁路杭州湾大桥开始地质详勘". www.thepaper.cn. Retrieved 2020-11-23.
  4. ^ "通苏嘉甬铁路开工建设,将成沿海铁路大通道重要一环". www.yangtse.com. Archived from the original on 2022-11-30. Retrieved 2022-11-30.
  • v
  • t
  • e
High-speed demonstrative maglev
Coastal
Hangshen
parallel
other branches
Beijing–Shanghai
West route
East route
branches
Beijing–Hong Kong (Taipei)§
To Hong Kong
To Taipei
Harbin–Hong Kong (Macau)§
Hohhot–Nanning
Beijing–Kunming
Branch lines
Baotou (Yinchuan)–Hainan
Lanzhou (Xining)–Guangzhou
Suifenhe–Manzhouli
Beijing–Lanzhou
Qingdao–Yinchuan
Eurasia Continental
Yangtze River
Old line
Shanghai–Kunming
Xiamen–Chongqing
Guangzhou–Kunming
Intercity and
long-distance
Regional intercity
Upgraded old lines
  • Italics: under construction or currently not operational
  • (-), Place A-: section under construction or currently not operational
  • §: in/related to Hong Kong, Macau, Taiwan
  • (Place A–Place B): share tracks with other lines


Stub icon

This People's Republic of China rail-related article is a stub. You can help Wikipedia by expanding it.

  • v
  • t
  • e