CGR 2nd Class 2-6-2TT

5 ft 10+12 in (1,791 mm) • Tube plates10 ft (3,048 mm)Boiler pressure130 psi (896 kPa)Safety valveSalterHeating surface:​ • Firebox58 sq ft (5.4 m2) • Tubes692 sq ft (64.3 m2) • Total surface750 sq ft (70 m2)CylindersTwoCylinder size15 in (381 mm) bore
20 in (508 mm) strokeValve gearStephensonTrain brakesClarke's chain brakesCouplersJohnston link-and-pin
Performance figures
Tractive effort11,546 lbf (51.36 kN) @ 75%
Career
OperatorsCape Government Railways
Class2nd Class
Number in class27
NumbersE17-E26, M5-M10, M25-M33, W1-W2
Delivered1875–1879
First run1875

The Cape Government Railways 2nd Class 2-6-2TT of 1875 was a South African steam locomotive from the pre-Union era in the Cape of Good Hope.

The first mixed traffic locomotives to enter service on the new 3 feet 6 inches Cape gauge mainlines of the Cape Government Railways were 2-6-2 Prairie type side-tank engines which were delivered between 1875 and 1879. Four-wheeled tenders were also acquired and the locomotives could be operated in either a tank or tank-and-tender engine configuration, as circumstances demanded. These locomotives were later designated the Cape 2nd Class.[1][2]

Cape Government Railways

In 1872, the Cape Government took over the operation of all railways in the Cape of Good Hope and established the Cape Government Railways (CGR). Shortly before, it had been decided to adopt the narrower 3 feet 6 inches gauge instead of the existing 4 feet 8½ inches broad gauge for all further railway expansions, since it would decrease the cost of construction through the difficult terrain which lay inland from the three major ports of the Cape of Good Hope at Cape Town, Port Elizabeth and East London. This narrower gauge is still known as Cape gauge.[1][3]

Since the operational area within the Colony was so vast, the CGR was divided into three semi-autonomous systems. The Eastern System was headquartered in East London, with A.E. Schmid as Chief Resident Engineer and J.D. Tilney as Locomotive Superintendent. The Midland System was headquartered in Port Elizabeth, with D. Jackson Scott as Chief Resident Engineer and Mr. Edwards as Locomotive Superintendent. The Western System was headquartered in Cape Town, with W.G. Brounger as Chief Resident Engineer as well as Consulting Engineer for the whole CGR, and Michael Stephens as Locomotive Superintendent.[3][4]

Manufacturers

The first Cape gauge mainline locomotives to enter service on the CGR were delivered in 1875. An order for six 2-6-2T Prairie type locomotives was placed with Robert Stephenson and Company, followed by a separate order for six four-wheeled tenders. The Stephenson locomotives were numbered W1 and W2 for the Western system and M7 to M10 for the Midland System.[2]

At the same time, four more locomotives were ordered from the Avonside Engine Company. Two of the Avonside locomotives went to the Midland System, numbered M5 and M6. The other two were intended for the Eastern System, but they were lost at sea during delivery when the ship Memento sank off East London on 5 February 1876.[2]

These locomotives were followed by nineteen more, all with optional tenders, ordered from three manufacturers.

  • Four were delivered from Kitson and Company in 1876, numbered in the range from E17 to E20 for the Eastern system.
  • Four were delivered from Avonside Engine Company in 1876 and 1878, numbered in the range from E21 to E24 for the Eastern system.
  • Nine more were delivered from Robert Stephenson in 1878 and 1879, numbered in the range from M25 to M33 for the Midland system.
  • The last two were delivered from Avonside Engine Company in 1879, numbered E25 and E26 for the Eastern system, to replace the two which had been lost at sea.[2]

When a locomotive classification system was introduced by the CGR, these locomotives were designated 2nd Class.[1]

Characteristics

Tenders

While all the locomotives were delivered with four-wheeled tenders, they could be operated with or without the tenders, as circumstances demanded. In practice, they were used in the tank engine configuration while performing shunting or short-distance work, and in the tank-and-tender configuration when an increased coal and water supply was required during longer distance mainline work.[1][4]

Brakes

The locomotives were equipped with Clarke's chain brakes. The braking system proved to be unsatisfactory, since breaking of the chain was not uncommon. In one instance this resulted in a bad accident with loss of life while a train was descending the Hex River rail pass.[1]

The chain brake was operated by a 58 inch (16 millimetres) link chain, which was carried on sheaves underneath the train along the centre, connected by coupling hooks between carriages or trucks. Under each vehicle, the chain hanged slack while not in use. It passed under two pulleys which were attached to pulling-rods to operate the wooden brake blocks. To operate the brakes, the chain could be tightened from either end of the train. The guard's van could be used to retard a train on down grades, or to stop the entire train. In the event of a broken or disconnected chain, however, the brake system was useless. By c. 1876, a simple vacuum brake system was introduced as a reserve brake.[4]

Service

One of these locomotives is known to have been named, number W1 Byron. All of them were renumbered on occasions when the CGR altered its locomotive numbering systems c. 1886, 1888, 1890 and 1896.[1][2]

By 1904, only three of them were still in service, being employed on shunting and construction tasks. By 1912, when locomotive classification and renumbering was implemented on the newly established South African Railways, none of these 2nd Class locomotives were still in service.[2]

Works numbers and renumbering

The builders, works numbers, years built, original numbers and known renumbering of the Cape 2nd Class of 1875 are listed in the table.[1][2]

CGR 2nd Class 2-6-2T & TT of 1875

Builder
Works
no.
Year
built
Loco
no.
1886
no.
1888
no.
1890
no.
1896
no.
1904
no.
Notes
Avonside 1110 1875 Lost at sea
Avonside 1111 1875 Lost at sea
Avonside 1112 1875 M5 105 105 205
Avonside 1113 1875 M6 106 106 206
Stephenson 2205 1875 W1 1 Byron
Stephenson 2206 1875 W2 2 2 2 2 2
Stephenson 2207 1875 M7 107 107 207 407
Stephenson 2208 1875 M8 108 108 208 408
Stephenson 2209 1875 M9 109 109 209 409
Stephenson 2210 1875 M10 110 110 210 410
Kitson 2038 1876 E17 617 617 617 617
Kitson 2039 1876 E18 618 618 618 618 618
Kitson 2040 1876 E19 19 619 619 619 619 Scrapped 1911
Kitson 2041 1876 E20 20 620 620 620
Avonside 1157 1876 E21 21 621 621 621
Avonside 1158 1876 E22 22 622 622 622
Avonside 1193 1878 E23 23 623 623 623
Avonside 1194 1878 E24 24 624 624 624
Stephenson 2332 1878 M25 125 125 225
Stephenson 2333 1878 M26 126 126 226
Stephenson 2334 1878 M27 127 127 227
Stephenson 2335 1878 M28 128 128 228
Stephenson 2336 1878 M29 129 129 229
Stephenson 2337 1878 M30 130 130 230
Stephenson 2338 1879 M31 131 131 231
Stephenson 2339 1879 M32 132 132 232
Stephenson 2353 1879 M33 Works 2352 or 2353
Avonside 1209 1879 E25 25 625 625 625
Avonside 1210 1879 E26 26 626 626 626

Illustration

The photographs illustrate the locomotive in various configurations.

  • CGR 2nd Class no. W2 of the Western System, without tender or "front porch railings", c. 1899
    CGR 2nd Class no. W2 of the Western System, without tender or "front porch railings", c. 1899
  • With tender, balloon chimney and "front porch railings", Grahamstown Station, c. 1880
    With tender, balloon chimney and "front porch railings", Grahamstown Station, c. 1880

References

Wikimedia Commons has media related to CGR 2nd Class 2-6-2TT.
  1. ^ a b c d e f g Holland, D.F. (1971). Steam Locomotives of the South African Railways. Vol. 1: 1859–1910 (1st ed.). Newton Abbott, England: David & Charles. pp. 23–25. ISBN 978-0-7153-5382-0.
  2. ^ a b c d e f g C.G.R. Numbering Revised, Article by Dave Littley, SA Rail May–June 1993, pp. 94–95.
  3. ^ a b The South African Railways – Historical Survey. Editor George Hart, Publisher Bill Hart, Sponsored by Dorbyl Ltd., Published c. 1978, pp. 4, 8, 11.
  4. ^ a b c Espitalier, T.J.; Day, W.A.J. (1943). The Locomotive in South Africa – A Brief History of Railway Development. Chapter II – The Adoption of the 3 ft. 6 in. Gauge on the Cape Government Railways. South African Railways and Harbours Magazine, July 1943. pp. 515–518.
  • v
  • t
  • e
Locomotives of the Cape of Good Hope
7' ¼" gauge4' 8½" gauge3' 6" gauge
2' 6" gauge
  • Namaqua Copper Pioneer
  • Walvis Bay Hope
2' gauge
  • v
  • t
  • e
Steam
7' ¼" gauge
Standard gauge
  • CGR 0-4-0ST Aid
  • Natal 0-4-0ST Durban
  • Natal 0-4-0WT Natal
  • Natal 4-4-0T Perseverance
Cape gauge
Tank engines
  • Durban's Congella
  • Durban's Edward Innes
  • Durban's John Milne
  • Durban's Sir Albert
Cape gauge
Tender engines
Cape gauge
Articulated
engines
2' 6" gauge
  • Cape Copper John King & Miner
  • Cape Copper Britannia
  • Cape Copper Caledonia
  • Cape Copper Clara
  • Cape Copper Condenser
  • Cape Copper Scotia
  • Namaqua Copper Pioneer
  • Walvis Bay 2-4-2T Hope
2' & 600mm
gauges
Electric
Gas-electric
Diesel
Cape gauge
Diesel-electric
2' gauge
Diesel-electric
Cape gauge
Diesel-hydraulic
Cape gauge
Electro-diesel